Building permits and occupancy permits in Morocco

In Morocco, almost every new building, extension or façade change requires a building permit. The application must be prepared and signed by an architect registered with the Order. We prepare it, file it and follow it until it is granted, and then through to the occupancy permit.

Steps to obtain a building permit

1. Check that the plot can be built on: planning information note from the urban agency and approved local development plan.

2. Design the project and produce the regulatory drawings: location, site plan, floor plans, sections and elevations.

3. Gather the documents: title certificate, cadastral plan, signed drawings, owner's undertaking, architect's contract.

4. File the application with the one-stop planning office, now online through the Rokhas platform, then follow the committees' opinions and answer their comments.

5. Pay the fees and collect the permit. It is valid for one year to start the works.

The occupancy permit

The occupancy permit (or certificate of conformity for non-residential uses) is requested when construction is complete. It confirms the building matches the approved permit and allows it to be legally occupied, connected to water and electricity, and sold. We prepare the completion declaration and attend the committee's inspection.

Changes and regularisation

If the project changes during construction, an amended permit must be obtained before the works are finished. We also look into regularisation cases and explain what the regulations allow.

Frequently asked questions

How long does it take to get a building permit?

For an individual villa with a complete file, it usually takes about one month. Larger projects or those reviewed by several committees take longer.

Is an architect mandatory?

Yes. In urban municipalities and for most projects, the drawings must be produced and signed by an architect registered with the Order.

Can the application be tracked online?

Yes, filing and tracking are done on the Rokhas platform. We keep you informed at every step.

When should the occupancy permit be requested?

When the works are complete and the building matches the approved drawings.